Leading Company of Ukraine

Industrial Solutions

  • Ukraine
  • +38 (056) 785-64-85

Leading Company of Ukraine

Industrial Solutions

Our Projects

ARCELORMITTAL KRYVYI RIH

Kryvyi Rih, Ukraine

2001 – 2019

  • Overhaul of blast furnace No. 8 in the Blast-Furnace Workshop No. 1
  • Overhaul of blast furnace No. 9 in the Blast-Furnace Workshop No. 2
  • Replacement of the shell’s conveyer No. 4. Assembling and erection works of new shell’s conveyer. Replacement of gas pipe line tracts, erection of new gas-treating plants, repair of driving mechanism
  • Repair of blast furnace No. 6 of BF Workshop-1
  • Repair of shell’s conveyer No. 1 in the Converter Workshop
  • Repair of the conveyer No. 3 in the Converter Workshop.
  • Repair of sinter machine No. 4 in the Sinter WorkshopRepair of conveyers and gutters of the coke-screening plant in Coke Workshop and Mixing Department of Coal Preparation Workshop of Coke and By-Product Process
  • Overhaul of coke furnace battery No. 3 complex in the Coke Workshop No. 1
  • Overhaul of Jobbing Mill-1, Jobbing Mill-3 of the Long Product Rolling Mill
  • Hot repair of coking chambers lining by flare torkret process (ceramic welding)
  • Repair of the furnace burden tract No. 2 in the Sintering Workshop No. 2
  • Repair of the sinter hopper capsules
  • Repair of equipment complexes on the conveyers No. 1 – 6
  • Repair of car dumper No. 3 in the Coal Preparation Workshop of the Coke and By-Product Process
  • Repair of the main mill table of 1300 blooming mill
  • Repair of gutters of hydraulic washing of 1300 blooming mill
  • Site joint of the self-moving steel teeming ladle car and slag car
  • Repair of the cable walkway of conveyer K-1P of the crushing workshop of the coke-screening station No. 1 in the Coke Workshop
  • Repair of screens in Coke Workshop
  • Repair of pipe lines and conveying pipes in Coke Workshop
  • Repair of dust free coke plants structures in Coke Workshop
  • Repair of the roofing in Coke Workshop
  • Recovery of corrosion-resistant coating of coke battery No.4
  • Restoration of converter Workshop floor
  • Dismantling and installation of the thermo probe BF No. 6

METINVEST, YENAKIIEV IRON AND STEEL WORKS

Yenakiievo, Ukraine

2007 – 2017

  • Overhaul of the converter (5 repairs)
  • Overhaul of the blast furnace
  • Overhaul of the sintering machine (4 repairs)
  • Overhaul of the lime kiln (2 repairs)
  • Overhaul of the continuous casting machine (4 repairs)
  • Repair of ladles blast-furnace brickwork
  • Overhaul of the rolling mill 550 (2 repairs)
  • Overhaul of the rolling mill 550 heating oven (5 repairs)
  • Maintenance and repair of the equipment in converter, rolling, sintering and other metallurgical shops

METINVEST, “ZAPORIZHSTAL”, PJSC

Zaporizhzhya, Ukraine

2016 – 2019

  • Overhaul of the blast furnace No5 in the blast furnace Workshop
  • Overhaul gas pipe line of the Blast-Furnace Workshop
  • Overhaul of Hot Thin Plate Rolling Workshop
  • Overhaul of changers of ingot buggy in the Blooming Workshop
  • Overhaul of the tail end and thin-sheet mill 1680 power equipment
  • Overhaul of slabbing mill 1150 mechanical equipment in the Blooming Workshop
  • Current repairs of sinter machines No. 1 – 6 mechanical equipment in the Sintering Workshop
  • Current repairs of conveyer No. 1-86 equipment in the Sintering Workshop
  • Current repair of gas extractor purification department sintering Workshop
  • Repair of replaceable equipment of the Sintering Workshop
  • Cleaning of furnace burden out blast-furnace No. 3. Mining and removal of melting products of low-carbon cast iron and removal of carbon and graphite blocks; fabrication and installation of steel structures of the cleaning gutter
  • Dismantling of the blast-furnace shell and cooling plates, cutting of large steel structures into properly sized parts by the oxygen cutting

METINVEST, “ZAPORIZHKOKS”, PAT

Zaporizhzhya, Ukraine

2016 – 2018

  • Overhaul of quencher
  • Overhaul of gasholder grounds of coke furnace battery No. 5 – 6
  • Overhaul of door lifter No. 3 of coke furnace battery 5 – 6 (with corrosion protection)
  • Current repair of loading dock pallet of crude benzol warehouse
  • Current repair of coke collection hopper of quenching car 1, quenching car 2
  • Current repair of coal charger No. 3 of coke furnace battery 5 – 6
  • Dismantling of hangars No. 1 – 3 at the site of construction and installation works

METINVEST, ILYICH IRON AND STEEL WORKS OF MARIUPOL

Mariupil, Ukraine

2014 – 2018

  • Overhaul of the converter
  • Overhaul of mechanical equipment, dismantling, manufacturing and installation of sites for the inclined bridge of blast furnace No. 5
  • Overhaul and installation of gas pipe line elements, dismantling and mantling of steel structures of gas exhaust ducts in the Oxygen-Converter Workshop
  • Modernization of rolling mill 3000 of roughing stand
  • Reconstruction of dust-trapping units of conveyer No. 1

METINVEST, PJSC “AZOVSTAL IRON & STEEL WORKS”,

Mariupil, Ukraine

2016 – 2019

  • Construction and installation works of 1st start-up facilities of processing equipment and pipelines of pulverized coal fuel. Injection body for pulverized coal fuel.
  • Overhaul and current repairs of the equipment in converter workshop, gaz workshop, boiler workshop, collection and desulphurization workshop
  • Overhaul of blast-furnace No. 3 as the part of implementation of the strategic investment project:
    • Installation and commissioning works on the erection of temporary power supply, temporary networks of water supply and water disposal of the construction site;
    • Dismantling of equipment and structures in a sub-bunker room;
    • Construction and installation works for the dismantling of aspiration of the skip pit and hoist of small-sized coke
  • Dismantling of bunkers blast-furnace № 1 and blast-furnace № 2
  • Construction and installation work on the installation of metal structures of retaining walls in the area of coke breeze leakage hoppers on blast-furnace 2

EVRAZ, “EVRAZ DNIPRO IRON AND STEEL WORKS”, PJSC

Dnipro, Ukraine

2018 – 2019

  • Overhaul and current repairs of the equipment, building structures and facilities, maintenance of equipment, installation of utility systems
  • Current repair of coke furnace battery No. 4 (recovery of refractory clay by ceramic welding)

EVRAZ, “DNIPRO METALLURGICAL COMPLEX”

Kamenske, Ukraine

2010 – 2019

  • Overhaul of the 3rd category of blast-furnace No. 9 on the Blast-Furnace Workshop
  • Overhaul of the 2rd category of blast-furnace No. 1
  • Overhaul of blast-furnace No. 12
  • Overhaul of the sinter machine No 8, No. 9 and No. 11
  • Overhaul of converter No1 № 2 of the converter Workshop
  • Overhaul of boiler OKG-130BD-M No. 1
  • Overhaul of car dumpers railway track in the Sintering Workshop No. 2
  • Overhaul of equipment for blast furnace No. 12
  • Current repair and maintenance of main production facilities
  • Current repair of gas pipelines and pipelines of the pipe stocking section of the rolling mill
  • Current repair of the mechanical equipment of the sinter shop No. 2 Integrated assembly of gas cleaning and waste heat boiler boiler OKG 130 BD3 1 converter № 1
  • Caisson (work package). Replacing beams (UB-1, PB 1, PB 2), boiler pipelines with fittings and a feed unit for converter boiler No. 2
  • Gas cleaning. Exhaust system for converter № 2
  • Maintenance of external compressed air networks Kap-30 No. 3
  • Replacement of supports at the object of the main signaling means of centralization and blocking, installation of a platform for the shore lighting of the pump station PS-2B of sinter machine 11 of sinter plant – 2
  • Equipment adjusting for the pulverized coal injection section in the Blast-Furnace Workshop
  • Elimination of clearance in chambers of oscillating scales No. 1, 2 in the Blast-Furnace Workshop
  • Installation of the fluid cooler “GARRIER” at the air distribution unit AKAp-40/35/4

EVRAZ, EVRAZ YUZHKOKS, PAO

(ex “Evraz Bagleykoks”, PJSC)

Kamenske, Ukraine

2002 – 2019

  • Current repair of the coke furnace batteries No. 5 of 35 furnaces and No 6 of 25 furnaces by flare torkret process

EVRAZ, “EVRAZ DNIPRODZERZHYNSK COKE AND CHEMICAL PLANT, PJSC

Kamenske, Ukraine

2011 – 2019

  • Hot repair of coking chambers lining by ceramic welding on coke furnace batteries No. 1 – BIS of 57 furnaces and No. 5 of 45 furnaces

PJSC “ DNEPROAZOT”

Kamenske, Ukraine

2018

  • Replacing the condenser in the carbamide workshop-2
  • Replacing ammonia-related reactor

KRAMFER, “KRAMATORSK FERROALLOY PLANT”, LLC

Kramatorsk, Ukraine

2013

  • Repair of power equipment and pipe lines

HEIDELBERGCEMENT

Kryvyi Rih, Ukraine

2013 – 2015

  • Modernization and repair of conveyers
  • Repair of the smoke exhausters by the type of cement smoke exhausters and gas recirculation smoke exhausters
  • Repair of belt conveyers
  • Repair of mechanical equipment of the feedstock
  • Repair of bucket elevator

“KHARKIV COKE PLANT”, PrivJSC

Kharkiv, Ukraine

2010 – 2018

  • Hot repair of coking chambers lining by flare torkret process

“GORLIVSK COKE AND CHEMICAL PALNT”

Gorlivka, Ukraine

2015

  • Hot repair of camera feed No. 252 of the coke-furnace battery

ARCELORMITTAL ALGERIE SPA

Annaba, Algeria

2015 – 2018

  • Overhaul and modernization of the agglomerator AGG-2 of the Sintering Workshop
  • Overhaul of 26 conveyers of the Sintering Workshop
  • Overhaul of the equipment at blast-furnace No. 2
  • Dismantling of old, installation and commissioning of 9 new hot-blast valves 1100 with flanges

POBUZHSK FERRONICKEL COMBINE

Pobuzke, Ukraine

2002 – 2018

  • Repair of the heat generators’ lining of the drying compartment during the transition to the pulverized coal fuel
  • Repair and replacement of shell’s lining and brickwork of the furnace roof arch during the repair of distribution transformer substation No. 1
  • Hot repair of the lining of distribution transformer substation 2 of the Metallurgical Workshop
  • Dismantling of old and mantling of new brick lining during overhaul of rotary tube furnace 1 and rotary tube furnace No. 2
  • Hot repair of the lining of rotary tube furnaces No. 3 – 4
  • Mantling of brick lining of rotary tube furnace 1, 2, 3
  • Dismantling of old and mantling of new brick and concrete lining duringoverhaul of rotary tube furnace 4

LA COMPANIA PROCESADORA DE NIQUEL DE IZABAL (PRONICO)

Izabal, Cuatemala

2014

  • Designer quality control of blast-furnace brickwork in the rotating kiln

 We are opened for unique and complex tasks. Get a quote →

Top